Tunnel fit-out and track laying fact sheet
Fact Sheets | 10 August 2020

Tunnel fit-out and track laying fact sheet

Tunnel fit-out is an essential part of the project and includes installation of rail infrastructure and electrical, mechanical, hydraulic, safety and communications systems.

Cross Passages and Emergency Egress Shafts fact sheet
Fact Sheets | 30 April 2019

Cross Passages and Emergency Egress Shafts fact sheet

Given the length of the tunnels, additional infrastructure is required to provide safe egress between the two tunnels and to ground level in the event of an emergency.

Tunnel Boring Machines fact sheet
Fact Sheets | 6 March 2019

Tunnel Boring Machines fact sheet

Tunnel boring machines (TBMs) are large machines that excavate below the ground surface, while simultaneously installing concrete lining units to build a tunnel.

Cross Passage Dundas incident update fact sheet
Fact Sheets | 18 December 2018

Cross Passage Dundas incident update fact sheet

On Saturday September 22, a leak developed at the first tunnel-to-tunnel cross passage, approximately 200m north of the Forrestfield Station site.

Sustainability fact sheet
Fact Sheets | 27 November 2018

Sustainability fact sheet

An efficient public transport system is an essential part of a sustainable city.